renders

Node

Collaboration with Kevin Kan (Industrial Design) and Jennifer Tran(HCI): 1 week. I worked in a team of 3 to design a thermostat in 1 week. Our design provides the elegance of expensive thermostats such as the Nest at a much

/ No comments

Node

Collaboration with Kevin Kan (Industrial Design) and Jennifer Tran(HCI): 1 week. I worked in a team of 3 to design a thermostat in 1 week. Our design provides the elegance of expensive thermostats such as the Nest at a much

/ No comments

Cliff House

Renders from my final project for Architecture Studio II. I was tasked with designing a vacation house for an art collector on a cliff in Wyoming. My design placed the home on top of the cliff with some areas set

/ No comments

Cliff House

Renders from my final project for Architecture Studio II. I was tasked with designing a vacation house for an art collector on a cliff in Wyoming. My design placed the home on top of the cliff with some areas set

/ No comments

Circuit Breaker

Individual project.  Fall 2011, 2 weeks. A series of renders of an industrial circuit breaker I found in an abandoned steel mill in Pittsburgh, PA. I was fascinated with the complexity and mass of this equipment and wanted to model

/ No comments

Circuit Breaker

Individual project.  Fall 2011, 2 weeks. A series of renders of an industrial circuit breaker I found in an abandoned steel mill in Pittsburgh, PA. I was fascinated with the complexity and mass of this equipment and wanted to model

/ No comments

Kahn Library

Assignment done for Introduction to Digital Media. I modeled and rendered Louis Kahn’s iconic Exeter Library. Producing this image required modeling in Rhino, rendering in VRay, and drawing section cuts in Illustrator. The model was reproduced from construction documentation.

/ No comments

Kahn Library

Assignment done for Introduction to Digital Media. I modeled and rendered Louis Kahn’s iconic Exeter Library. Producing this image required modeling in Rhino, rendering in VRay, and drawing section cuts in Illustrator. The model was reproduced from construction documentation.

/ No comments